Brookhurst Street runs south from our yard in Anaheim through Garden Grove into Westminster, and Euclid Street does the same a mile east, so a crew is at a Westminster curb in about 25 minutes with no freeway. The city incorporated in 1957, mid-boom, and the Building Division at City Hall on Westminster Boulevard checks plans for a wall, a footing or a cover. The approach through the curb belongs to Public Works and takes its own permit, filed with the drive.
Midway City is the exception in the middle of the map. It is county ground with the city on nearly every side, and a lot there is permitted by Orange County, not by Westminster, with the county's own inspector at the pour. We read the parcel before the permit. Little Saigon along Bolsa Avenue is the commercial heart of the city, and the residential blocks behind it are the densest in the towns we cover, with side yards a barrow fits and a mixer does not.
The ground is the flat of the coastal plain, silt and fine sand a few dozen feet above the sea, and it holds a slab well but gives it nowhere to drain. Surface water on a Westminster lot goes to the street or nowhere, so every slab we pour is graded to the curb at a quarter inch a foot, and a back patio hemmed in by block walls gets a drain to a pipe under the side yard. A 1960s block wall on the line has little footing, so a patio stops short of it.