Our yard is in Anaheim and the crew takes the 91 west to the 605 south and comes off at Carson Street, about 25 minutes with the mixer following. Plans go to the City of Hawaiian Gardens building counter at City Hall on Pioneer Boulevard. The city is a square mile, so an inspector is never far, and a permit for a new approach or a wall is turned round quickly because there are few of them in a week.
The houses between Norwalk Boulevard and Pioneer Boulevard are mostly 1940s and 1950s, small, and set on lots that have been added to since, a second unit at the back, a carport beside the house, a wider drive to fit two cars. Each addition brought its own slab, and the lot is now a patchwork with a step at every seam. Most calls here begin with one panel and end with the whole front, because once the tape is on the ground the seams are what the owner has been tripping on.
Access is the other thing a small lot decides. Side yards are often under 4 feet wide, so concrete for a rear patio goes through the gate by barrow, and a lot with a rear unit is poured from the street in one pass so the barrows run once. Coyote Creek is a concrete channel along the east edge of the city beside the 605, and the lots nearest it are the lowest, where a slab is pitched to the street with more care because the ground gives it nowhere else to send water.