Our yard is in Anaheim, and the crew takes the 57 north through Brea Canyon to the Diamond Bar Boulevard or Grand Avenue exits, about 25 minutes when the freeway is moving. Plans go to the City of Diamond Bar Building and Safety Division at City Hall on Copley Drive. The city only incorporated in 1989, so a drive poured before then was permitted by Los Angeles County, and its record, if there is one, is with the county rather than the city.
The tracts off Golden Springs Drive and along Brea Canyon Road were built in the 1960s and 1970s with the garage set below the street, so the drive falls in from the curb. The later houses up Grand Avenue and toward Chino Hills more often sit above the road, and the drive climbs. The two need different low ends, and we walk the drive with a level before the estimate is written so the drain or the thickened apron is already in the figure.
A mixer cannot chute uphill. On a drive that climbs more than a few feet the concrete is pumped from the street, which adds a machine and a morning but lets the crew place the whole slab in one pour instead of in lifts. Behind the house the pads are cut into the hill and held by a slope, and we pour patios there to the edge the grading plan drew and no further, since the fill at the edge of a pad is the softest ground on the lot.